surge chamber

英 [sɜːdʒ ˈtʃeɪmbə(r)] 美 [sɜːrdʒ ˈtʃeɪmbər]

缓冲室;均衡室

化学



双语例句

  1. For the special form of surge chamber, ordinary design methods cannot satisfy the actual engineering needs.
    针对特殊的调压室形式,一般的设计方法以不能满足工程的实际需要。
  2. A Side Issue in Volume calculation of the Surge Chamber for Slush Pumps
    钻井泵空气包体积计算中的一个问题
  3. Construction techniques for steel enclosed air cushion surge chamber at Jinkang hydropower station are described here.
    对金康水电站钢包气垫式调压室的有关施工技术进行了介绍。
  4. Investigation on the selection type of pump outlet valve& for the pipeline with pneumatic surge chamber
    水泵出口阀门类型选择的研究&采用气压式调压室的输水系统
  5. Calculation of Lifting Force and Surge during Closure of Cate in Surge Chamber
    调压室闸门关闭时的吊力与涌浪计算
  6. Analysis on Small Fluctuations Stability of Water Diversion System with Air-cushion Surge Chamber
    含气垫式调压室的引水系统小波动稳定性分析
  7. Pressure balance system is used to balance lateral water pressure outside reinforced concrete of the air cushion surge chamber and air pressure in the surge chamber.
    同时,采用平压系统平衡气室钢筋混凝土外侧水压力和气室气体压力。
  8. Numerical model for predicting the air losses in the operation process of air-cushioned surge chamber
    预测气垫式调压室运行中漏气量的数学模型
  9. Based on hydrochemistry, REE, carbon and oxygen isotope analyzing, possible leakage way of the Air-Cushioned Surge Chamber is studied in the Xiaotiandu power-station.
    利用水化学、稀土元素和碳氧同位素的分析方法探讨了小天都电站调压室可能的渗水途径。
  10. For air cushion surge chamber at Jinkang hydropower station, air cushion is enclosed by reinforced concrete embedded with a thin steel sheet.
    金康水电站气垫式调压室钢包方案,是依靠钢筋混凝土夹一层薄钢板封闭气体。
  11. And there are studies on the water hammer of hydropower station and surging wave of the surge chamber for the study on the pressure non-steady flow.
    对水电站有压非恒定流问题的研究往往归结为对水电站水击和调压室涌波的分析研究。
  12. The influence of surge chamber diameter, throttled orifice and other factors on transmission pressure has been studied.
    研究了调压井直径、阻抗孔口等因素对穿井压力的影响,以及考虑压力钢管隧洞调压井连接处压力随时间变化的边界条件计算钢管中的水击压力。
  13. The water level fluctuation of downstream surge chamber, the pressure variation of air pressure chamber and the water hammer pressure are calculated with an actual project, the influence of initial state for air surge chamber to bottom pressure of surge chamber is discussed.
    结合某一实际工程计算了上下游调压室的水位波动、气压室的压力变化和高压管道的水击压力,并讨论了气压室的初始状态对调压室底部压力的影响。
  14. Formula for outflow at gate opening during lifting and closing of gate in surge chamber is derived.
    推导出了调压室闸门启闭过程的闸孔出流量公式。
  15. Lastly, hydraulic model test of diversion system is carried out. The model scale selection of hydraulic model which includes open channel, long diversion tunnel and surge chamber is discussed.
    在整体水力模型试验研究中,着重研究了既包含有明流段又有长引水隧洞和调压室的梯级电站引水系统模型率,并对这种复杂引水系统水力模型的比尺选择进行了探讨。
  16. This paper introduces the effect of the impedance factor to the highest and the lowest amplitude value of the impedance surge chamber and analyzes the reasonable selection for the impedance factor of the surge chamber.
    介绍了阻抗系数对阻抗式调压室波动的最高和最低幅值的影响,分析了如何合理地选择调压室的阻抗系数。
  17. Research on the Main Design Problems of Air-Cushioned Surge Chamber
    气垫式调压室设计中的主要问题研究
  18. Design and layout of air cushion surge chamber
    气垫式调压室的布置设计与体会
  19. Discussion on simulation of transient in air cushion surge chamber
    气垫式调压室过渡过程模拟的若干问题探讨
  20. Surge chamber is a fairly reliable level pressure structure of reducing water hammer pressure and increasing surge system stability.
    调压室是减小水击压力、提高调节系统稳定性的比较可靠的平压建筑物。
  21. The operation principle, parameter choice and surge calculation method for air cushion surge chamber are presented in this paper.
    本文介绍了气垫式调压室的工作原理、参数选择及涌波计算方法。
  22. Parameter Choice and Surge Calculation for Air Cushion Surge Chamber
    气垫式调压室参数选择及涌波计算
  23. Calculation of water diversion for air cushion surge chamber and conventional surge chamber
    气垫调压室与常规调压室双室引水系统的计算
  24. Calculation of transient process for upstream air cushion surge chamber system
    上游气垫调压室系统过渡过程的计算
  25. The equation of transition process state for double chamber water diversion system in hydropower station with upstream air cushion surge chamber is described. The numerical value solution is introduces and the calculation program is drew up.
    建立了描述具有上游气垫式调压室的水电站双室引水发电系统过渡过程状态方程,介绍了其数值解法并编制了计算程序。
  26. It was very important for surge chamber of negative pressure isolating room to control pollution in isolation ward and bio-safety lab.
    隔离病房和生物安全实验室中,负压隔离室用缓冲室对控制污染起到了非常重要的作用。
  27. Calculation Study on Optimal Design of Surge Chamber of Low Water Head Power Station
    低水头电站调压室优化设计计算研究
  28. The tailrace surge chamber shared by two units, common in hydropower stations with diversion systems, has problems of water level fluctuation and hydraulic disturbance.
    双机共尾水调压室是水电站引水发电系统中一种常见的布置形式,存在尾水调压室水位波动和水力干扰问题。
  29. The hydraulic characteristics of the throttled surge chamber under various hydraulic transition processes are analyzed through combination of numerical simulation and model test.
    通过带调压室水电站的模型试验和数值仿真计算,分析了阻抗式调压室在各种水力过渡过程下的水力工作特性。
  30. Combined with hydrogeological information gained by exploration and hydrographical drilling, groundwater types and leakage ways under the water curtain corridor and Air-Cushioned Surge Chamber are found out, which provide the grouting engineering with more effective treatment.
    结合水电工程勘查及水文地质钻探获取得的地下水文地质信息,查明了水电站水幕廊道和气垫调压室渗水的地下水类型和渗漏途径,为调压室的进一步灌浆处理提供了依据。